Thank you for contacting us.
We will respond as soon as possible.
An impact noise reduction system that involves the direct gluing of ceramic flooring onto DBRED rubber underlays with an SBR rubber layer.
Feasible with reduced thickness, starting from cement surfaces or pre-existing floorings. The entire application process requires a cement adhesive for flooring.
This system is particularly suitable for interventions in the renovation of inter-floor structures to enhance impact noise insulation and reduce structural transmission of footsteps on stairs.